The requirements for granting this qualification will be met when competency is demonstrated and achieved for:
Note: UEENEEJ109A - Those holding an ‘Certificate III in Refrigeration and Air-conditioning trade qualification or equivalent" meet the requirements of this unit and its pre-requisite requirements.
UEENEED104A
|
Use engineering applications software on personal computers
|
40
|
UEENEEE011C
|
Manage risk in electrotechnology activities
|
60
|
UEENEEE080A
|
Apply industry and community standards to engineering activities
|
20
|
UEENEEE083A
|
Establish and follow a competency development plan in an electrotechnology engineering discipline
|
120
|
UEENEEE101A
|
Apply Occupational Health and Safety regulations, codes and practices in the workplace
|
20
|
UEENEEE102A
|
Fabricate, assemble and dismantle utilities industry components
|
40
|
UEENEEE103A
|
Solve problems in ELV single path circuits
|
40
|
UEENEEE105A
|
Fix and secure electrotechnology equipment
|
20
|
UEENEEE107A
|
Use drawings, diagrams, schedules, standards, codes and specifications
|
40
|
UEENEEE117A
|
Implement and monitor energy sector OHS policies and procedures
|
20
|
UEENEEE124A
|
Compile and produce an energy sector detailed report
|
60
|
UEENEEE137A
|
Document and apply measures to control OHS risks associated with electrotechnology work
|
20
|
UEENEEJ040B
|
Manage refrigeration and air conditioning projects
|
40
|
UEENEEJ069B
|
Plan refrigeration and air conditioning projects
|
60
|
UEENEEJ102A
|
Prepare and connect refrigerant tubing and fittings
|
30
|
UEENEEJ103A
|
Establish the basic operating conditions of vapour compression systems
|
60
|
UEENEEJ104A
|
Establish the basic operating conditions of air conditioning systems
|
20
|
UEENEEJ106A
|
Install refrigerant pipe work, flow controls and accessories
|
60
|
UEENEEJ107A
|
Install air conditioning and refrigeration systems, major components and associated equipment
|
80
|
UEENEEJ108A
|
Recover, pressure test, evacuate, charge and leak test refrigerants
|
60
|
UEENEEJ109A
|
Verify functionality and compliance of refrigeration and air conditioning installations
|
20
|
UEENEEJ110A
|
Select refrigerant piping, accessories and associated controls
|
50
|
UEENEEJ111A
|
Diagnose and rectify faults in air conditioning and refrigeration systems and components
|
40
|
UEENEEJ113A
|
Commission air conditioning and refrigeration systems
|
40
|
UEENEEJ127A
|
Establish the thermodynamic parameters of refrigeration and air conditioning systems
|
80
|
UEENEEJ128A
|
Produce HVAC/R system design drawings
|
80
|
UEENEEJ129A
|
Establish heat loads for commercial refrigeration and/or air conditioning applications
|
80
|
UEENEEJ138A
|
Analyse vibration and noise in refrigeration and air conditioning systems
|
80
|
UEENEEJ153A
|
Find and rectify faults in motors and associated controls in refrigeration and air conditioning systems
|
50
|
UEENEEJ164A
|
Analyse the operation of HVAC air and hydronic systems
|
80
|
UEENEEJ165A
|
Evaluate thermodynamic and fluid parameters of refrigeration systems
|
100
|
UEENEEJ170A
|
Diagnose and rectify faults in air conditioning and refrigeration control systems
|
70
|
UEENEEJ192A
|
Analyse the psychrometric performance of HVAC/R systems
|
50
|
UEENEEJ194A
|
Solve problems in low voltage refrigeration circuits
|
40
|
UEENEEK132A
|
Develop strategies to address environmental and sustainability issues in the energy sector
|
20
|
UEENEEP012A
|
Disconnect / reconnect composite appliances connected to low voltage installation wiring
|
60
|
UEENEEP017A
|
Locate and rectify faults in low voltage composite appliances using set procedures
|
20
|
UEENEEP024A
|
Attach cords and plugs to electrical equipment for connection to a single phase 230 Volt supply
|
20
|
UEENEEP025A
|
Attach cords, cables and plugs to electrical equipment for connection to 1000 Va.c. or 1500 Vd.c. supply
|
20
|
|
|
BSBMGT502B
|
Manage people performance
|
70
|
BSBINM501A
|
Manage an information or knowledge management system
|
50
|
BSBMGT516C
|
Facilitate continuous improvement
|
60
|
BSBINN502A
|
Build and sustain an innovative work environment
|
50
|
BSBWOR502B
|
Ensure team effectiveness
|
60
|
CPCCOHS1001A
|
Work safely in the construction industry
|
10
|
HLTAID001
|
Provide cardiopulmonary resuscitation
|
10
|
MEM16006A
|
Organise and communicate information
|
20
|
MEM16008A
|
Interact with computing technology
|
20
|
MEM30001A
|
Use computer aided drafting systems to produce basic engineering drawings
|
40
|
MEM30002A
|
Produce basic engineering graphics
|
40
|
MEM30003A
|
Produce detailed engineering drawings
|
80
|
MEM30004A
|
Use CAD to create and display 3D models
|
40
|
|
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 6. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
Note: For further information see Application of the NQC Flexibility Formula, UEE11 Electrotechnology Training Package, Version 1, Volume 1 Qualification Framework
|
Up to 120 points
|
UEENEEJ114A
|
Resolve problems in hydronic systems
|
40
|
UEENEEJ115A
|
Resolve problems in beverage dispensers
|
40
|
UEENEEJ116A
|
Resolve problems in transport refrigeration systems
|
20
|
UEENEEJ117A
|
Resolve problems in ultra-low temperature refrigeration systems
|
20
|
UEENEEJ118A
|
Resolve problems in post mix refrigeration systems
|
20
|
UEENEEJ119A
|
Resolve problems in ice making systems
|
20
|
UEENEEJ166A
|
Resolve problems in dairy refrigeration systems
|
20
|
UEENEEJ167A
|
Resolve problems in central plant air conditioning systems
|
40
|
UEENEEJ168A
|
Maintain microbial control of refrigeration and air conditioning systems
|
20
|
UEENEEJ171A
|
Resolve problems in refrigerated beverage vending cabinets
|
20
|
UEENEEJ174A
|
Apply safety awareness and legal requirements for hydrocarbon refrigerants
|
10
|
UEENEEJ175A
|
Service and repair self contained hydrocarbon air conditioning and refrigeration systems
|
20
|
UEENEEJ176A
|
Install and commission hydrocarbon refrigeration systems, components and associated equipment
|
20
|
UEENEEJ178A
|
Apply safety awareness and legal requirements for ammonia refrigerant
|
10
|
UEENEEJ179A
|
Repair and service ammonia refrigeration systems
|
20
|
UEENEEJ180A
|
Install and commission ammonia refrigeration systems, components and associated equipment
|
20
|
UEENEEJ182A
|
Repair and service secondary refrigeration systems
|
20
|
UEENEEJ184A
|
Apply safety awareness and legal requirements for carbon dioxide refrigerant
|
10
|
UEENEEJ185A
|
Repair and service carbon dioxide refrigeration systems
|
20
|
UEENEEJ186A
|
Install and commission carbon dioxide refrigeration systems, components and associated equipment
|
20
|
UEENEEJ188A
|
Repair and service self contained carbon dioxide refrigeration and heat pump systems
|
20
|
UEENEEC006B
|
Prepare tender submissions for electrotechnology projects
|
60
|
UEENEEE015B
|
Develop design briefs for electrotechnology projects
|
40
|
UEENEEE126A
|
Provide solutions to basic engineering computational problems
|
60
|
UEENEEJ132A
|
Design commercial refrigeration systems and select components
|
80
|
UEENEEJ133A
|
Design industrial refrigeration systems and select components
|
80
|
UEENEEJ134A
|
Design heating, ventilation and air conditioning (HVAC) systems and select components
|
60
|
UEENEEJ135A
|
Design control systems for refrigeration or heating, ventilation and air conditioning systems
|
80
|
UEENEEJ136A
|
Evaluate and report on building services energy management systems
|
80
|
UEENEEJ137A
|
Evaluate and report on the indoor air quality of buildings
|
40
|
UEENEEJ177A
|
Design hydrocarbon refrigerated systems
|
40
|
UEENEEJ181A
|
Design ammonia refrigerated systems
|
40
|
UEENEEJ183A
|
Design secondary refrigerant systems
|
40
|
UEENEEJ187A
|
Design carbon dioxide refrigerated systems
|
40
|
UEENEEK151A
|
Develop effective engineering strategies for energy reduction in buildings
|
60
|
UEENEEC007B
|
Manage contract variations
|
40
|
UEENEEJ139A
|
Develop specifications and prepare drawings for HVAC/Refrigeration projects
|
60
|
UEENEEJ141A
|
Design complex commercial refrigeration systems and select equipment
|
40
|
UEENEEJ142A
|
Design complex industrial refrigeration systems and select equipment
|
40
|
UEENEEJ143A
|
Design complex air conditioning systems and select equipment
|
120
|
UEENEEJ144A
|
Design mechanical ventilation/exhaust systems and select equipment
|
40
|
UEENEEJ145A
|
Design hydronic systems and select equipment
|
80
|
UEENEEJ146A
|
Design complex control systems for refrigeration or heating, ventilation, air conditioning systems
|
80
|
UEENEEJ147A
|
Audit energy use for commercial HVAC/Refrigeration systems
|
40
|
UEENEEJ148A
|
Audit HVAC/R control systems for compliance with regulations and standards
|
60
|
UEENEEJ149A
|
Develop heat exchanger design specifications
|
80
|
UEENEEJ150A
|
Evaluate new and alternative technologies applicable to electrotechnology applications
|
40
|
1. Pre-requisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a pre-requisite pathway for the progression to achieve particular competencies or qualification at a higher level
3. Registered training organisations shall also provide information related to the relevant pathway(s) that may be taken to achieve paraprofessional status ("associate membership") with a professional engineering membership organisation.