The requirements for granting this qualification will be met when competency is demonstrated and achieved for:
All the Core competency standard units, defined in the Core Competency Standard Units table below and
A combination of Elective competency standard units to achieve a total weighting of 180 points in accordance with the Elective Competency Standard Units table below.
Note: UEENEEG105A - Those holding an ‘Unrestricted Electricians Licence or equivalent issued in an Australian State or Territory meets the requirements of this unit and its pre-requisite requirements.
UEENEEE038B
|
Participate in development and follow a personal competency development plan
|
20
|
UEENEEE101A
|
Apply Occupational Health and Safety regulations, codes and practices in the workplace
|
20
|
UEENEEE102A
|
Fabricate, assemble and dismantle utilities industry components
|
40
|
UEENEEE104A
|
Solve problems in d.c. circuits
|
80
|
UEENEEE105A
|
Fix and secure electrotechnology equipment
|
20
|
UEENEEE107A
|
Use drawings, diagrams, schedules, standards, codes and specifications
|
40
|
UEENEEE117A
|
Implement and monitor energy sector OHS policies and procedures
|
20
|
UEENEEE124A
|
Compile and produce an energy sector detailed report
|
60
|
UEENEEE137A
|
Document and apply measures to control OHS risks associated with electrotechnology work
|
20
|
UEENEEG006A
|
Solve problems in single and three phase low voltage machines
|
80
|
UEENEEG033A
|
Solve problems in single and three phase low voltage electrical apparatus and circuits
|
60
|
UEENEEG063A
|
Arrange circuits, control and protection for general electrical installations
|
40
|
UEENEEG101A
|
Solve problems in electromagnetic devices and related circuits
|
60
|
UEENEEG102A
|
Solve problems in low voltage a.c. circuits
|
80
|
UEENEEG103A
|
Install low voltage wiring and accessories
|
20
|
UEENEEG104A
|
Install appliances, switchgear and associated accessories for low voltage electrical installations
|
20
|
UEENEEG105A
|
Verify compliance and functionality of low voltage general electrical installations
|
40
|
UEENEEG106A
|
Terminate cables, cords and accessories for low voltage circuits
|
40
|
UEENEEG107A
|
Select wiring systems and cables for low voltage general electrical installations
|
60
|
UEENEEG108A
|
Trouble-shoot and repair faults in low voltage electrical apparatus and circuits
|
40
|
UEENEEG109A
|
Develop and connect electrical control circuits
|
80
|
UEENEEG171A
|
Install, set up and commission interval metering
|
20
|
UEENEEK125A
|
Solve basic problems in photovoltaic energy apparatus and systems
|
20
|
UEENEEK135A
|
Design grid connected photovoltaic power supply systems
|
60
|
UEENEEK145A
|
Implement and monitor energy sector environmental and sustainable policies and procedures
|
20
|
UEENEEK148A
|
Install, configure and commission LV grid connected photovoltaic power systems
|
40
|
|
|
|
|
|
|
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
|
0
|
90
|
|
|
0
|
90
|
|
You may select all your elective units from this Group
|
90
|
180
|
UEENEEC001B
|
Maintain documentation
|
20
|
UEENEEC002B
|
Source and purchase material/parts for installation or service jobs
|
20
|
UEENEEC003B
|
Provide quotations for installation or service jobs
|
20
|
UEENEEC010B
|
Deliver a service to customers
|
20
|
UEENEED101A
|
Use computer applications relevant to a workplace
|
20
|
UEENEEE009B
|
Comply with scheduled and preventative maintenance program processes
|
20
|
UEENEEE020B
|
Provide basic instruction in the use of electrotechnology apparatus
|
20
|
CPCCOHS1001A
|
Work safely in the construction industry
|
10
|
HLTAID001
|
Provide cardiopulmonary resuscitation
|
10
|
|
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
Note: For further information see Application of the NQC Flexibility Formula, UEE11 Electrotechnology Training Package, Version 1, Volume 1 Qualification Framework
|
Up to 90 points
|
|
|
UEENEED104A
|
Use engineering applications software on personal computers
|
40
|
UEENEEE190A
|
Prepare engineering drawings using manual drafting and CAD for electrotechnology/utilities applications
|
60
|
UEENEEE191A
|
Prepare electrotechnology/utilities drawings using manual drafting and CAD equipment and software
|
60
|
UEENEEG120A
|
Select and arrange equipment for special LV electrical installations
|
60
|
UEENEEI116A
|
Assemble, enter and verify operating instructions in microprocessor equipped devices
|
20
|
UEENEEI150A
|
Develop, enter and verify discrete control programs for programmable controllers
|
60
|
UEENEEK123A
|
Carry out basic repairs to renewable energy apparatus
|
80
|
UEENEEK124A
|
Solve basic problems in micro hydro systems
|
20
|
UEENEEK127A
|
Diagnose and rectify faults in renewable energy control systems
|
60
|
UEENEEK128A
|
Solve problems in stand-alone renewable energy systems apparatus and systems
|
60
|
UEENEEK130A
|
Solve problems in wind energy conversion systems rated up to 10 kW
|
60
|
UEENEEK134A
|
Install ELV stand-alone photovoltaic power systems
|
60
|
UEENEEK136A
|
Install, configure and commission LV micro-hydro systems rated up to 6.4 kW
|
20
|
UEENEEK137A
|
Install, set up and maintain ELV micro-hydro systems rated up to 6.4 kW
|
20
|
UEENEEK143A
|
Install small wind energy conversion systems rated up to 10 kW for ELV stand-alone applications
|
20
|
UEENEEK144A
|
Install, configure and commission LV wind energy conversion systems rated up to 10 kW
|
40
|
UEENEEC004B
|
Prepare specifications for the supply of materials and equipment for electrotechnology projects
|
40
|
UEENEEC005B
|
Estimate electrotechnology projects
|
40
|
UEENEEE192A
|
Produce detailed electrotechnology /utilities drawings using computer aided design equipment and software
|
60
|
UEENEEG076A
|
Install and replace low voltage current transformer metering
|
20
|
UEENEEG121A
|
Verify compliance and functionality of special LV electrical installations
|
40
|
UEENEEG122A
|
Conduct compliance inspection of single phase LV electrical installations
|
60
|
UEENEEG123A
|
Conduct compliance inspection of LV electrical installations with demand exceeding 100 A per phase
|
40
|
UEENEEG124A
|
Conduct compliance inspection of special LV electrical installations
|
60
|
UEENEEG125A
|
Plan electrical installations with a low voltage demand up to 400 A per phase
|
40
|
UEENEEG172A
|
Investigate and report on electrical incidents and causes
|
60
|
UEENEEG175A
|
Develop compliance policies and plans to conduct a electrical contracting business
|
80
|
UEENEEG179A
|
Develop detailed electrical drawings
|
60
|
UEENEEI151A
|
Develop, enter and verify word and analogue control programs for programmable logic controllers.
|
60
|
UEENEEI152A
|
Develop, enter and verify programs in Supervisory Control and Data Acquisition systems
|
60
|
UEENEEK152A
|
Develop strategies to address sustainability issues for electrical installations
|
20
|
1. Prerequisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.