The following provides the packaging rules for this qualification, followed by the list of relevant units of competency.
All elective units selected from outside this qualification must reflect current occupational and learning outcomes of this AQF qualification level.
There are prerequisites to imported units listed in this qualification. Where a unit is imported as an elective care must be taken to ensure that all prerequisites specified are complied with.
|
|
|
BSBTWK502
|
Manage team effectiveness
|
BSBWHS521
|
Ensure a safe workplace for a work area
|
RIIENV501E
|
Implement and maintain environmental management plans
|
RIIQUA501E
|
Implement, monitor and develop quality management plans
|
RIIRIS501E
|
Implement and maintain management systems to control risk
|
|
|
RIICWM501E
|
Implement civil construction plans
|
RIICWM502E
|
Implement civil works maintenance programs
|
|
BSBFIN501
|
Manage budgets and financial plans
|
BSBHRM522
|
Manage employee and industrial relations
|
BSBHRM523
|
Coordinate the learning and development of teams and individuals
|
BSBHRM525
|
Manage recruitment and onboarding
|
BSBINS501
|
Implement information and knowledge management systems
|
BSBOPS502
|
Manage business operational plans
|
BSBOPS505
|
Manage organisational customer service
|
BSBPEF501
|
Manage personal and professional development
|
BSBPMG530
|
Manage project scope
|
BSBPMG531
|
Manage project time
|
BSBPMG532
|
Manage project quality
|
BSBPMG533
|
Manage project cost
|
BSBPMG534
|
Manage project human resources
|
BSBPMG535
|
Manage project information and communication
|
BSBPMG536
|
Manage project risk
|
BSBPMG537
|
Manage project procurement
|
BSBPMG540
|
Manage project integration
|
BSBSTR501
|
Establish innovative work environments
|
BSBSTR502
|
Facilitate continuous improvement
|
LGACOM401A
|
Administer contracts
|
LGAWORK501A
|
Prepare preliminary design for operational works
|
LGAWORK502A
|
Prepare detailed works project documentation
|
LGAWORK503A
|
Undertake project investigation
|
MSL924003
|
Process and interpret data
|
MSL925004*
|
Analyse data and report results
|
MSL954004
|
Obtain representative samples in accordance with sampling plan
|
MSL973021
|
Conduct field-based acceptance tests for construction materials
|
MSL973022
|
Conduct laboratory-based acceptance tests for construction materials
|
MSL974026*
|
Perform tests to determine the properties of construction materials
|
MSL975031*
|
Supervise sampling, inspections and testing at construction sites
|
MSL975044*
|
Perform complex tests to measure engineering properties of materials
|
RIIBLA401E
|
Manage blasting operations
|
RIIBLA403
|
Design blasts
|
RIICWD503E
|
Prepare traffic management plans and traffic guidance schemes
|
RIICWD538*
|
Prepare traffic management plans and traffic guidance schemes for high volume roads
|
RIICWD539*
|
Prepare traffic management plans and traffic guidance schemes for motorways and freeways
|
RIICWM503E
|
Prepare civil works cost estimates
|
RIICWM504E
|
Prepare civil works bill of quantities
|
RIICWM505E
|
Prepare civil works schedule of rates
|
RIILAT402E
|
Provide leadership in the supervision of diverse work teams
|
RIIRAI502D
|
Develop and implement site plant and resource management plan
|
RIIRIS403E
|
Manage and coordinate spill response
|
RIISAM501E
|
Implement and maintain the site plant, equipment and infrastructure maintenance plans
|
*Note the following prerequisite unit requirements.
|
|
MSL925004 Analyse data and report results
|
MSL924003 Process and interpret data
|
MSL974026 Perform tests to determine the properties of construction materials
|
MSL973022 Conduct laboratory-based acceptance tests for construction materials
|
MSL975031 Supervise sampling, inspections and testing at construction sites
|
MSL954004 Obtain representative samples in accordance with sampling plan
MSL973021 Conduct field-based acceptance tests for construction materials
|
MSL975044 Perform complex tests to measure engineering properties of materials
|
MSL974026 Perform tests to determine the properties of construction materials
MSL973022 Conduct laboratory-based acceptance tests for construction materials
|
RIICWD538 Prepare traffic management plans and traffic guidance schemes for high volume roads
|
RIICWD503E Prepare traffic management plans and traffic guidance schemes on multilane roads and signalised intersections
|
RIICWD539 Prepare traffic management plans and traffic guidance schemes for motorways and freeways
|
RIICWD503E Prepare traffic management plans and traffic guidance schemes on multilane roads and signalised intersections
|