To be awarded the PMA50116 Diploma of Process Plant Technology competency must be achieved in units of competency:
core units of competency
elective units of competency, chosen as specified below:
a minimum of from Group A
the remainder may be chosen from Groups A, B and C (with a maximum of from Group C) to bring the total number of electives to .
elective units can be chosen from other qualifications in this Training Package, other endorsed Training Packages and accredited courses, as specified in Group C.
: Where prerequisite units are identified they must be counted in the total number of units required for achievement of the qualification.
Complete all units from the following list.
|
|
|
MSMENV272
|
Participate in environmentally sustainable work practices
|
MSMSUP200
|
Achieve work outcomes
|
MSMSUP210
|
Process and record information
|
MSMWHS200
|
Work safely
|
|
|
|
|
PMAOPS500
|
Optimise production systems
|
|
PMAOPS501
|
Provide operational expertise to a project team
|
|
PMAOPS505
|
Control the process during abnormal situations
|
|
PMAOPS511
|
Determine energy transfer loads
|
|
PMAOPS512
|
Determine mass transfer loads
|
|
PMAOPS520
|
Manage utilities
|
|
PMAOPS521
|
Plan plant shutdown
|
|
PMAOPS522
|
Coordinate plant shutdown
|
|
Up to technical elective unit may be chosen from Group A in PMA60116 Advanced Diploma of Process Plant Technology
|
|
|
|
|
MSMWHS503
|
Maintain WHS management system
|
|
MSMWHS510
|
Manage risk
|
|
PMAOMIR512
|
Establish incident response preparedness and response systems
|
|
PMASUP520
|
Review procedures to minimise environmental impact of process
|
|
PMASUP540
|
Analyse equipment performance
|
|
PMAWHS502
|
Contribute to safety case
|
|
PMAWHS511
|
Manage emergency incidents
|
|
|
|
|
|
MSL954004
|
Obtain representative samples in accordance with sampling plan
|
|
MSMENV472
|
Implement and monitor environmentally sustainable work practices
|
|
MSMOPS400
|
Optimise process/plant area
|
|
MSMOPS401
|
Trial new process or product
|
|
MSMPER300
|
Issue work permits
|
MSMWHS201
|
MSMPER400
|
Coordinate permit process
|
MSMPER300
|
MSMSUP390
|
Use structured problem-solving tools
|
|
MSMSUP400
|
Develop and monitor quality systems
|
|
MSMSUP404
|
Coordinate maintenance
|
|
MSMSUP405
|
Identify problems in fluid power system
|
|
MSMSUP406
|
Identify faults in electronic control
|
|
MSMWHS400
|
Contribute to WHS management system
|
|
MSMWHS401
|
Assess risk
|
|
MSS403085
|
Ensure process improvements are sustained
|
|
MSS403011
|
Facilitate implementation of competitive systems and practices
|
|
MSS405013
|
Facilitate holistic culture improvement in an organisation
|
|
MSS403086
|
Improve cost factors in work practices
|
|
MSS403040
|
Facilitate and improve implementation of 5S
|
|
MSS403054
|
Facilitate breakthrough improvements
|
|
MSS403087
|
Mistake proof an operational process
|
|
MSS404084
|
Undertake process capability improvements
|
MSS404052
|
MSS404060
|
Facilitate the use of planning software systems in a work area or team
|
|
MSS404085
|
Undertake proactive maintenance analyses
|
|
MSS404086
|
Assist in implementing a proactive maintenance strategy
|
|
MSS404054
|
Apply statistics to operational processes
|
|
PMAOMIR407
|
Audit incident preparedness and established response systems
|
|
PMAOMIR418
|
Coordinate incident response
|
|
PMAOMIR424
|
Develop and maintain community relationships
|
|
PMAOMIR430
|
Conduct and assess incident exercises
|
|
PMAOMIR444
|
Develop incident containment tactics
|
|
PMAOPS280
|
Interpret process plant schematics
|
|
PMAOPS350
|
Match and adjust colour
|
|
PMAOPS402
|
Respond to abnormal process situations
|
MSMSUP390
|
PMAOPS405
|
Operate complex control systems
|
|
PMAOPS410
|
Operate remote production facilities
|
|
PMAOPS411
|
Manage plant shutdown and restart
|
|
PMAOPS433
|
Manage wells and gathering systems
|
|
PMAOPS434
|
Commission wells and gathering systems
|
|
PMAOPS450
|
Solve colour problems
|
|
PMAOPS460
|
Monitor and operate tailings management facilities
|
|
PMASUP410
|
Develop plant documentation
|
|
PMASUP420
|
Minimise environmental impact of process
|
|
PMASUP440
|
Commission/recommission plant
|
|
PMASUP441
|
Decommission plant
|
|
PMASUP444
|
Plan plant preparation and isolation
|
|
PMASUP445
|
Participate in HAZOP studies
|
PMAOPS280
|
TAEASS401
|
Plan assessment activities and processes
|
|
TAEASS402
|
Assess competence
|
|
TAEASS403
|
Participate in assessment validation
|
|
Up to relevant units may be chosen from this Training Package, other endorsed Training Packages and accredited courses, where those units are packaged in a Certificate IV or above.
|