To achieve this qualification, the candidate must demonstrate competency in:
32 units of competency:
26 core units
6 elective units.
Some units in this qualification may have prerequisite requirements, which must be met when packaging the qualification. Users are referred to the list of CPC08 units with prerequisite unit requirements available in this Training Package for this purpose.
|
CPCPCM2039A
|
Carry out interactive workplace communication
|
CPCPCM2040A
|
Read plans and calculate plumbing quantities
|
CPCPCM2041A
|
Work effectively in the plumbing and services sector
|
CPCPCM2043A
|
Carry out WHS requirements
|
CPCPCM2045A
|
Handle and store plumbing materials
|
CPCPCM2046A
|
Use plumbing hand and power tools
|
CPCPCM2047A
|
Carry out levelling
|
CPCPCM2048A
|
Cut and join sheet metal
|
CPCPCM2050A
|
Mark out materials
|
CPCPCM2052A
|
Weld using oxy-acetylene equipment
|
CPCPCM2053A
|
Weld using manual metal arc welding equipment
|
CPCPCM2055A
|
Work safely on roofs
|
CPCPCM3021A
|
Flash penetrations through roofs and walls
|
CPCPGS3046A
|
Install LPG systems in caravans, mobile homes and mobile workplaces
|
CPCPGS3047A
|
Install LPG systems in marine craft
|
CPCPGS3048A
|
Install gas pressure control equipment
|
CPCPGS3049A
|
Install Type A gas appliance flues
|
CPCPGS3051A
|
Purge consumer piping
|
CPCPGS3052A
|
Maintain Type A gas appliances
|
CPCPGS3053A
|
Disconnect and reconnect Type A gas appliances
|
CPCPGS3054A
|
Calculate and install natural ventilation for Type A gas appliances
|
CPCPGS3056A
|
Install gas piping systems
|
CPCPGS3057A
|
Size consumer gas piping systems
|
CPCPGS3059A
|
Install LPG storage of aggregate storage capacity up to 500 litres
|
CPCPGS3061A
|
Install and commission Type A gas appliances
|
HLTFA211A
|
Provide basic emergency life support
|
|
|
CPCCCM2008B
|
Erect and dismantle restricted height scaffolding
|
CPCCCM2010B
|
Work safely at heights
|
CPCCCM3001C
|
Operate elevated work platforms
|
CPCCOHS2001A
|
Apply OHS requirements, policies and procedures in the construction industry
|
CPCCRI3001A
|
Operate personnel and materials hoists
|
CPCCST2005A
|
Carry out load slinging of off-site materials
|
CPCPCM2049A
|
Cut using oxy-LPG-acetylene equipment
|
CPCPCM2054A
|
Carry out simple concreting and rendering
|
CPCPCM3022A
|
Weld polyethylene and polypropylene pipes using fusion method
|
CPCPCM3023A
|
Fabricate and install non-ferrous pressure piping
|
CPCPGS3055A
|
Install gas sub-meters
|
CPCPGS3060A
|
Install LPG storage of aggregate storage capacity exceeding 500 litres and less than 8KL
|
CPCPMS2021A
|
Assemble mechanical services components
|
CPCPMS3031A
|
Fabricate and install steel pressure piping
|
CPCPMS3033A
|
Install small bore heating systems
|
CPCPMS3035A
|
Install and test ducting systems
|
MEM05049B
|
Perform routine gas tungsten arc welding
|
MEM05050B
|
Perform routine gas metal arc welding
|
RIICCM210D
|
Install trench support
|